Over one billion euro has been invested in the wellness and spa industry in Bulgaria over the past more...
Search | Hotels / Accommodation | Vacations | Tours & Trips | Rent A Car | Transport | Flights | Conferences | Press Centre | Yachting |
Subscribe to newsletters to receive our hottest offers:
Home > Vidin > News |
“The short list” of companies for surveillance of the construction works on the adjoining infrastructure on Bulgarian territory of a bridge over the Danube River in Vidin – Calafat
The short list of companies for the contract “Survaillance on the construction works along the adjoining infrastructure on Bulgarian territory for bridge over the Danube River in Vidin – Calafat (Bulgaria - Romania)”. It was published in the official web site of EC.
Short listed participants are:
1. Grusamar Ingenieria Y Consulting S.L. (Spain), Elsamex S.A. (Spain)
2. High-point Rendel (UK), Ingerop (France), Salfo and Associates Limited (Greece)
3. Hyder Consulting Ltd (UK), Acerplan GmbH (Germany), Obermeyer Planen+Beraten GmbH (Germany),
4. INOCSA Ingenieria S.L. (INOCSA) (Spain), DIWI Consult International GmbH (Germany), ARDANUY Ingenieria S.A. (Spain)
5. ITALFERR SpA (Italy), Ineco (Spain), Tecnic SpA (Italy)
6. Parsons Brinckerhoff Ltd (United Kingdom), Rutex (Bulgaria), Tecnica y Proyectos S.A. (TYPSA) (Spain)
7. Pell Frischmann Consulting Engineers Ltd. (UK), EI Trans Engineering S.P. (Bulgaria)
8. PROINTEC S.A. (Spain), BONIFICA SPA (Italy), SERING INGEGNERIA SRL (Italy)
The final date for auction documents submission is 28.06.2007. The received offers will be assessed, according to the regulations of ES. The contract is planned to be signed in September 2007. Independent engineer surveillance will be appointed for the construction of the adjacent railway infrastructure to the bridge over the Danube River in Vidin – Calafat.
The construction works include:
- The construction of 15 kilometres single electrical line, together with contact network, illumination, system for remote control, signal system and telecommunication;
- The construction of international cargo station;
- Reconstruction of the passenger station;
- Construction of 8 km long four line road;
The execution of the project is planned to be finalized in 37 months.
2013/05/15
Over one billion euro has been invested in the wellness and spa industry in Bulgaria over the past more...
2013/05/13 00:12:57
Borovets hosted Drop The Mountain Borovets 2013 - the first mass bike ride on mountain terrain in more...
2013/05/12
Thracian Cliffs Beach and Golf Resort will host the European Tour's 50th Volvo World Golf more...